1 / 7

2nd floor bathroom where I bought all the materials from tiles to silicone and just left the construction to them๐ There were many variables and the company made a lot of mistakes, so the construction period was long, but I feel good every time I go into the bathroom after it's finished..๐ค Because there were a lot of problems with the construction before I moved in, there were a lot of problems, but I changed it to my taste while I was at it. Space planning is always difficult and hard, but when you see the results, all the hard work seems to be washed away : ) It's not completely finished yet, but I'll record the changes little by little ๐ซง #Bathroom interior #์์ค์ธํ ๋ฆฌ์ด์ํ #์ ๋ฝํ์ธํ ๋ฆฌ์ด #๋นํฐ์ง์ธํ ๋ฆฌ์ด #ํธํ ์์ค #์ค๋ฒ์ธํ ๋ฆฌ์ด #๋ฒ ์ด์ง์ธํ ๋ฆฌ์ด #์์ค๊ฑฐ์ธ #์์ #์์ค์์ดํ #์์ค์๋ฉ์ฅ #์์ค์๋ฉ์ ๋ฐ #๋ฐ์ ํ์ธํ ๋ฆฌ์ด #์ฃผํ์ธํ ๋ฆฌ์ด